What the example shows
166 POBs rebuilt from deferral items, and a 250.00 manual shift found in a contract that still nets to zero. Second workflow: the effect rolled forward a month, with a check that closed periods did not change.
What you get
- The ebook: an 83-page PDF that walks through the workflow tool by tool
- 2 tested Alteryx workflows (10_Allocation_Effect.yxmd, 10b_Effect_Rollforward.yxmd)
- Synthetic sample data (3 files) and an answer key, so you can check every number
- Runs in Alteryx Designer 2023.1 or later; one zip, delivered by email right after payment
Contents
- Chapter 1What allocation moved, and the proof
- Chapter 2The two files
- Chapter 3Cleaning the deferral items
- Chapter 4The delta sum and the control
- Chapter 5The SSP allocation, rebuilt
- Chapter 6Four proofs, three outputs
- Chapter 7Reading the result
- Chapter 8Moving it to your system
- Chapter 9A month later
- Chapter 10Exercises
- Appendix ATool-by-tool settings
- Appendix BOutput field dictionary
- Appendix CAnswer key
Look inside


